Check Details
In PostgreSQL synchronization tasks, ring links are not supported during task configuration. If a ring link exists, the verification task will report an error. If the source end synchronization object has multiple tasks, an alarm will be triggered. Check whether the task configurations are reasonable.
Fixing Method
Follow the interface prompts to cancel tasks that have loopback or duplicate synchronizations, and then perform the verification task again.
Was this page helpful?