tencent cloud

Feedback

Upgrading a Cluster

Last updated: 2024-12-11 19:05:33

    Overview

    Tencent Cloud TKE allows you to upgrade the Kubernetes version. You can use this feature to upgrade a running Kubernetes cluster. The upgrade process includes pre-upgrade checking, upgrading the Master, and upgrading the node.

    Upgrade Notice

    The upgrading action is irreversible. Perform this operation with caution.
    Before upgrading the cluster, check whether the cluster is healthy. If the cluster is abnormal, you can fix it yourself or consult online.
    Upgrade sequence: when upgrading a cluster, you must first upgrade the Master, and then upgrade the node as quickly as possible. During the upgrade process, we recommend that you do not perform any operations in the cluster.
    Only upgrading to the next Kubernetes version offered by TKE is supported. Upgrading across multiple versions (such as upgrading from 1.8 to 1.12, skipping 1.10) is not supported. You can upgrade to the next version only if the Master and node versions are consistent.
    Incompatibility of CSI-CFS add-on: as for the CSI add-ons: COS CSI and CFS CSI, the CSI add-on versions adapted to different Kubernetes versions have the following differences. Therefore, we recommend that you reinstall the CSI add-on in add-on management page when you upgrade the cluster to TKE 1.14 and later version. The rebuilding of the add-on does not affect COS and CFS storage already in use.
    The version of the CSI add-on adapted for Kubernetes 1.10 and Kubernetes 1.12 is 0.3.
    The CSI add-on version for Kubernetes 1.14 and later is 1.0.
    The failure of HPA: before Kubernetes 1.18, the apiversion of the deployment object referenced in HPA may be extensions/v1beta1, but after Kubernetes 1.18, the apiversion of deployment is only apps/v1, which may cause the failure of HPA after the cluster is upgraded to Kubernetes 1.18. If you use the HPA feature, we recommend that you run the following command to switch the apiVersion in the HPA object to apps/v1 before upgrading.
    kubectl patch hpa test -p '{"spec":{"scaleTargetRef":{"apiVersion":"apps/v1"}}}'
    The failure of Helm applications: each application, including those installed through the application marketplace or third parties, supports different versions of Kubernetes. Before upgrading a cluster, you are advised to view the list of applications installed in the cluster and check the range of cluster versions supported by the applications. Some applications are adaptable to higher versions of Kubernetes, and you may need to upgrade them. Some applications may not be adaptable to higher versions of Kubernetes, and in which case, upgrade the cluster with caution.
    Nginx-ingress version issue: extensions/v1beta1 and networking.k8s.io/v1beta1 ingress APIs are no longer provided in v1.22. For more information, see here. If the Nginx-ingress version in your cluster is too early, upgrade the Nginx-ingress add-on on the add-on management page after you upgrade Kubernetes to v1.22 or later.

    How It Works

    Upgrading a cluster involves two steps. The first step is to upgrade the Master Kubernetes version and the second is to upgrade the node Kubernetes version. See below for details:
    
    

    Upgrading the Master Kubernetes version

    Note:
    Currently, Master version upgrades of managed clusters and self-deployed clusters are supported, and the upgrade takes 5-10 minutes, during which you are unable to operate your cluster.

    Notes for Master major version and minor version upgrade

    Currently, the upgrade of Master supports the major version upgrade (for example, from 1.14 to 1.16), and the minor version upgrade (for example, from 1.14.3 to 1.14.6, or from v1.18.4-tke.5 to v1.18.4-tke.6). We strongly recommend that you check the corresponding feature release records before upgrading:
    Before upgrading the major version of kubernetes, we recommend that you check the Update Notes of TKE Kubernetes Major Versions.
    Before upgrading the minor version of kubernetes, we recommend that you check the TKE Kubernetes Revision Version History.
    Note:
    For major version upgrades (for example, from 1.12 to 1.14), the original custom parameters will not be retained, you need to reconfigure them for the new version. For more information, see Custom Kubernetes Component Launch Parameters.
    For minor version upgrades, the custom parameters will be retained, and you do not need to reconfigure them.

    Points for attention

    Before upgrading, read the Upgrade Notice.
    For TKE clusters of the v1.7.8, the network mode is bridge. Upgrading the cluster does not automatically switch the network mode to cni.
    Upgrading the cluster does not switch kube-dns to core-dns.
    When you upgrade a cluster to v1.10 and 1.12, some features configured when the cluster is created, such as support for ipvs, will become unavailable.
    After the upgrade of an existing cluster, if the master version is 1.10 or later, and the node version is V1.8 or earlier, the PVC feature will be unavailable.
    After upgrading the master version, we recommend that you upgrade the node version as soon as possible.

    Technical principles of Master upgrade

    The master node upgrade involves 3 steps: pre-dependent component upgrade, Master node component upgrade, and post-dependent component upgrade.
    Pre-dependent component upgrade: the pre-dependent components, such as monitoring components, will be upgraded to prevent component exceptions due to compatibility problems.
    Master node component upgrade: all corresponding components of Masters will be upgraded in sequence. When the previous component is upgraded successfully, the upgrade of next component starts. TKE will first upgrade kube-apiserver, then kube-controller-manager and kube-scheduler, and finally kubelet. The specific steps are as follows:
    Regenerate the yaml file corresponding to the static Pod of the kube-apiserver component.
    Check whether the current kube-apiserver Pod is healthy and whether the kubernetes version is normal.
    Similarly, upgrade kube-controller-manager and kube-scheduler in sequence.
    Upgrade kubelet and check whether the master node is ready.
    Post-dependent component upgrade:
    Upgrade the post-dependent components as needed, such as kube-proxy (and change its rolling update strategy to on delete), and cluster-autoscaler components.
    Perform some compatibility operations related to post-dependent components to prevent component exceptions due to compatibility problems.

    Master upgrade

    1. Log in to the TKE console and select Cluster in the left sidebar.
    2. On the Cluster Management page, select the ID of the desired cluster, and enter the cluster details page.
    3. On the cluster details page, click Basic Information on the left.
    4. In the cluster information module on the cluster’s Basic Information page, click Upgrade to the right of the Master version, as shown in the figure below:
    
    
    5. In the pop-up window, click Submit and wait until the upgrade is complete.
    6. You can view the upgrade progress in the cluster status of the cluster management page, or you can view the current upgrade progress, master node upgrade progress (the managed cluster does not display the specific Master node list), and the upgrade duration in the upgrade progress pop-up window, as shown below:
    
    
    7. In this example, the original master version of the cluster is 1.10.5. After the upgrade, the Master version is 1.12.4. This is shown in the following figure:
    
    

    Upgrading the node Kubernetes version

    After the cluster’s Master Kubernetes version is upgraded, the cluster list page will show that an upgrade is available for the cluster node, as shown below:
    
    

    Points for attention

    Before upgrading, read the Upgrade Notice.
    You can upgrade the node when it’s running.

    Selecting an upgrade method

    You can upgrade the node Kubernetes version in two ways: reinstall and rolling upgrade and in-place rolling upgrade.
    Reinstall and rolling upgrade: reinstall the node to upgrade the node version. This method only supports major version upgrades, such as upgrades from version 1.10 to version 1.12.
    In-place rolling upgrade: upgrade directly without re-installation. This only replaces components such as Kubelet and kube-proxy. Currently, this method supports both major and minor upgrades, such as from version 1.10 to version 1.12, or from version 1.14.3 to version 1.14.8.

    Principles of reinstall and rolling upgrade

    Rolling upgrade based on the reinstalled node. Only one node is upgraded at a time. When the previous node is upgraded successfully, the upgrade of next node starts. See below:
    
    
    Pre-upgrade checking: check the Pods on a node before draining. The specific items for pre-upgrade checking are as follows:
    Calculate the number of pods of all workloads in this node. If the Pod number of any workload changes to 0 after the node is drained, then the check fails, and the upgrade cannot be performed.
    The following system control plane workloads will be ignored:
    l7-lb-controller
    cbs-provisioner
    hpa-metrics-server
    service-controller
    cluster-autoscaler
    Evicting Pods: first mark the node as unschedulable. Then, evict or delete all Pods from the node.
    Removing nodes: remove the node from the cluster. This step only performs basic cleanup, and will not delete the node instance of the node in the cluster. Therefore, the node’s attributes such as label and taint are retained.
    Reinstalling nodes: reinstall the node’s operating system and reinstall the new version of kubelet.
    Post-upgrade checking: check whether the node is ready and schedulable, and check whether the current proportion of unavailable Pods exceeds the max limit.

    Reinstall and rolling upgrade (node Kubernetes version)

    1. Log in to the TKE console and select Cluster in the left sidebar.
    2. On the Cluster Management page, select the ID of the cluster for node Kubernetes version upgrade to enter the cluster details page.
    3. In the cluster information module, click Upgrade to the right of the Node Kubernetes version, as shown in the figure below:
    
    
    4. In the Notes on Upgrade step, select Reinstall and rolling upgrade as the upgrade method. Read the upgrade notice carefully, check the checkbox of I have read and agree to the terms above, and then click Next.
    Note:
    This upgrade method will reinstall the operating system, and the original data will be cleared. Back up the data in advance.
    
    
    
    5. In the Select nodes step, select the nodes to be upgraded, and click Next.
    6. In the Upgrade Settings step, enter the node information as required, and click Next.
    7. In the Confirmation step, confirm the information and click Finish to start the upgrade.
    8. View the progress of the node upgrade until all the nodes are upgraded.
    
    

    Principles of in-place rolling upgrade

    Node in-place upgrade uses the rolling upgrade method, meaning that it will only upgrade one node at a time, with the next node not being upgraded until the current node upgrade is successful. In-place upgrade currently supports the upgrades of major version and different minor versions of the major version. This is shown in the following figure:
    
    The steps are described as follows:
    Component updating: replace and restart the kubelet and kube-proxy components on the node.
    Post-upgrade checking: check whether the node is ready and check whether the proportion of currently unavailable Pods exceeds the max limit.

    In-place rolling upgrade

    1. Log in to the TKE console and select Cluster in the left sidebar.
    2. On the Cluster Management page, select the ID of the desired cluster and enter the cluster details page.
    3. In the cluster information module, click Upgrade to the right of the Node Kubernetes version, as shown in the figure below:
    
    
    4. In the Notes on Upgrade step, select In-place rolling upgrade as the upgrade method. Read the upgrade notice carefully, place a check mark next to I have read and agree to the terms above, and then click Next, as shown in the figure below:
    
    
    5. In the Select nodes step, select the nodes to be upgraded, and click Next.
    6. In the Confirmation step, confirm the information and click Finish to start the upgrade.
    7. View the progress of the node upgrade until all the nodes are upgraded.
    
    
    Contact Us

    Contact our sales team or business advisors to help your business.

    Technical Support

    Open a ticket if you're looking for further assistance. Our Ticket is 7x24 avaliable.

    7x24 Phone Support