Overview
After completing the verification task, users can either start the task directly from the verification operation page or from the task list page.
The validity period for verification is 2 hours. If the task is not started immediately after verification and is started after 2 hours, the task needs to be re-verified.
Directions
1. Log in to the DTS console, select Data Migration on the left sidebar, select the target migration task, and click More > Immediate start in the Operation column. 2. In the pop-up window, confirm that everything is correct and click OK.